Pricing
Real ranges. Confirmed on site.
These bands are the same numbers the estimator uses. Your final price is measured at the property — free — before any hose comes off the truck.
Service bands
Minimums cover getting a truck and equipment to your address. The high end of a band is what heavy algae, second stories, or access issues push toward.
| Service | Unit | Range | Minimum |
|---|---|---|---|
| Lawn Mowing & Maintenance | visit | $45 – $160 | $45 |
| Landscaping Design & Installation | project | $850 – $12,000 | $450 |
| Pressure Washing | sqft | $0 – $0 | $149 |
| House Soft Washing | sqft | $0 – $0 | $249 |
| Roof Soft Washing | sqft | $0 – $0 | $349 |
| Gutter Cleaning & Brightening | linear-ft | $1 – $2 | $149 |
| Fence & Deck Restoration | sqft | $0 – $1 | $249 |
| Yard Cleanup & Hauling | hour | $65 – $95 | $195 |
| Commercial Property Care | project | $200 – $3,500 | $200 |
Cadence multipliers
Weekly
−15%
The lowest cost per visit, because a week of growth is a smaller job than two weeks of growth. This is the correct cadence through a South Texas growing season.
Every other week
base
Fine in the cool season. Through summer it means cutting off more than a third of the blade at once, which yellows the lawn — so we will tell you when it is time to move to weekly.
Monthly
+25%
Costs more per visit because a month of growth is a heavier cut. Not appropriate for St. Augustine during the growing season — the lawn will not take it.
One time
+40%
Highest per-visit rate, because a single stop does not share a route with anything. Plenty of our recurring customers started here.
Property size bands
Under 5,000 sq ft
~3,500 sq ft lot
5,000 – 10,000 sq ft
~7,500 sq ft lot
10,000 – 20,000 sq ft
~15,000 sq ft lot
20,000 sq ft – 1 acre
~30,000 sq ft lot
Over 1 acre
~60,000 sq ft lot
What moves the price
Heavy algae or mildew
×1.18
Deep green or black growth that needs a longer dwell and a second pass
Two stories or elevated
×1.25
Second-story reach, or a home elevated on piers
Steep roof pitch
×1.20
Steeper than roughly 6:12 — slower and more careful access
First cut / overgrown
×1.60
Over about eight inches, needing a staged reset rather than one pass
Stamped, stained, or sealed concrete
×1.22
Decorative surfaces need much lower pressure and more time
Oil or rust stains
×1.15
Targeted treatment — improves substantially, may not fully clear
No spigot near the work
×1.12
We bring our own supply, which takes extra setup
Narrow or locked gate access
×1.10
Equipment has to be sized down or carried through
Seal after restoration
×1.75
Second visit after a 48-hour dry window, moisture verified first
Discounts
Senior discount
We take money off for seniors. Mention it when you call or note it on your quote request and we apply it to the estimate before you agree to anything.
Veteran discount
Veterans get a discount on every service we offer. No paperwork, no hoops — tell us you served and it comes off the price.